April 4, 2018

Transportation for the energy sector of Ukraine

The power industry of Ukraine is an important branch of industry in Ukraine, a set of subsystems serving to transform, distribute and use energy resources of all kinds. Its goal is to ensure the production of energy by converting primary, natural energy into secondary energy, for example, into electrical or thermal energy. It is based on the use of traditional types of thermal and hydro-electric power stations with a deviation from the average world statistics towards greater use of nuclear power plants. Most of the existing energy facilities were created by the efforts of energy specialists of the Ukrainian SSR, and now needs to be modernized.

The electric power industry plays a very important role in the economic complex of Ukraine. Approximately half of the total primary fuel (coal, oil, gas, uranium) that Ukraine produces or imports, as well as the energy of individual rivers, is used to produce electricity and heat. The development of the electric power industry stimulates the creation of new industrial units. Separate industries are geographically close to sources of cheap electricity, for example, non-ferrous metallurgy. Electric power in Ukraine is mainly generated at TPPs, HPPs, PSPs and nuclear power plants. In the long term, it is planned to use environmentally friendly energy sources, the country has all the opportunities for using alternative and non-traditional energy sources, in particular – wind, solar and thermal energy.

The Neolit Logistics has been transporting cargo for modernization of TPPs, HPPs, PSPs and nuclear power plants for 10 years to date. Over the period of work, more than 100 units of various equipment, such as:

  •      RVD (high pressure rotor), RSD (medium pressure rotor), RND (low pressure rotor), turbo generators,
  •      ¼ of the lower turbine ring of the hydraulic turbine 38 t. 7,036х3,21х3,
  •     Sector of the turbine cover of the hydroelectric unit 103t. 9.19×2.9×4.46,
  •     Sector of turbine cover of hydroelectric unit 71t. 6,667х2,9х4,
  •     The support of the thrust bearing of the turbine of the hydroelectric unit is 44 tons. 5.8×2.85×3.79,
  •     The turbine’s working wheel is 123t. 7.33×7.33×2.973,
  •     Rotor shaft turbine hydroelectric 107t. 9,6х3,18х3,26,
  •     Bearing housing of the turbine turbine of the hydraulic unit of 32 tons. 4.79х4.79х1.26,
  •     Stator turbine hydroelectric 56t. 7,26х2,27х3,94,
  •     Autotransformers АТДЦТН, АОДЦТ, АОДЦТН,
  •     Transformers ТД, ТЦ, ТДЦ

And this is not the entire list of oversized cargo transported with the help of the specialists of the Neolit Logistics ​​group of companies.

In the gallery:

  •     Transportation of rotor ТГВ 200 after planned repair. Cargo parameters: length 11,75 m, width 2,6 m, diameter 1,15 m, weight of cargo with lodgmentals 52 t.
  •     Rotor shaft turbine hydroelectric unit: 107 tons, 9.6×3.18×3.26 m.
  •     ¼ of the lower ring of the turbine of the hydroelectric unit: 38t, 7,036×3,21×3 m.
  •     Autotransformer ATTTSTN – 125000/220/110 – 68 U1