Transport: Powerful MAN prime mover + heavy-duty low-loader trailer.
Completed Work
Preparation: Planning and approval of a safe route, taking cargo weight into account.
Securing: Ensuring the structure is securely fastened.
Key features
Efficiency and safety: The organization of the process enabled delay-free transport in full compliance with safety standards, taking into account the risks associated with operations in areas close to military hostilities.
Maximum stability: The use of a low-bed trailer compensated for the height (2.6 m) and ensured complete safety during complex maneuvering.